Where Buildings Waste Water, Electricity and Materials
Share this post
Brought to you by Emergent Africa
A practical guide for South African property owners, managing agents and organisations with multi-site operations
A shopping centre manager who wants to reduce water consumption could spend the next capital budget replacing toilets. The better first step might be to visit the centre after closing time. If the water meter is still turning, the manager needs to know what is drawing water. A leaking cistern, a cleaning shift, an irrigation cycle and a cooling tower can produce similar-looking bills. Each calls for a different decision.
The same principle applies to electricity and waste. An office building can buy less grid electricity after installing solar panels while its air-conditioning plant continues to cool empty floors. A food court can improve its recycling rate while its tenants throw away more food. A warehouse can pay for the same number of waste collections after cutting its waste volume because nobody changed the contract.
For organisations managing dozens or hundreds of buildings across South Africa, the commercial opportunity lies in connecting three things that are often reviewed separately: what the building consumes, what happens on site and what the organisation actually pays for. Once those connections are visible, management can direct maintenance and capital to the buildings where they will make the greatest difference.
1. Set a national standard that works in local conditions
South Africa’s Department of Water and Sanitation reported national water losses of 40.8% of system input volume in its 2023 assessment. Non-revenue water, a broader measure that includes water supplied without generating revenue, was 47.4%. These figures describe water supply systems. A property owner needs meter readings and site investigations to establish losses inside its own buildings. The national figures nevertheless explain why reducing demand and understanding supply exposure deserve executive attention. dws.gov.za
Local circumstances determine which investments make sense. In Johannesburg, an equipment supplier documented how a shopping centre repurposed existing stormwater infrastructure, creating 278,000 litres of usable storage within a larger concrete tank. In KwaZulu-Natal, eThekwini has published plans for water reuse schemes at several treatment works. In the Western Cape, the City of Cape Town announced Level 1 water restrictions from 1 December 2026 and asked residents, visitors and businesses to reduce consumption by at least 10%. These examples point to three different management decisions: inspect infrastructure the business already owns, establish whether a future municipal supply could serve a site, and adjust current operations to respond to a local restriction. grundfos.com
A national property company should therefore standardise what each site must know. Every manager should know where the main meters are, who checks them, which uses continue after hours, who can authorise repairs and how the applicable tariffs work. The choice of equipment can then follow local evidence. A tank specification suitable for a Gauteng shopping centre may offer poor value at a small branch with limited roof area, low flushing demand or expensive plumbing alterations.
The same discipline makes benchmarking fairer. Compare shopping centres with broadly similar trading hours and tenant mixes. Compare occupied offices using both floor area and attendance where reliable figures exist. Compare hotels by occupied room-night and distribution centres by operating hours or throughput. Retain absolute consumption alongside these measures. An expanding portfolio can become more efficient per square metre while still needing more water and electricity overall. For offices, the Green Building Council South Africa provides a locally developed energy and water benchmarking methodology. GBCSA
2. Find the water that disappears between the meter and the point of use
A useful water audit starts with a simple question: where did last month’s kilolitres go? Draw a basic map from the incoming meter to the largest uses. Depending on the site, these might include tenant premises, public ablutions, kitchens, cooling towers, irrigation, laundries or vehicle washing. If a single meter serves several buildings, identify where an additional reading would change a maintenance or investment decision. Commercial water-efficiency guidance identifies metering, leak detection, plumbing fixtures, kitchens and mechanical plant as distinct opportunities, each requiring its own investigation. epa.gov
Start by reading the main meter at closing and opening for a representative week. Where interval data are available, look for a sustained change in the minimum flow during the quietest hours. Ask security, cleaners and engineering staff what was running. A hospital or distribution centre may have legitimate overnight consumption. A closed office with a persistent new flow deserves prompt investigation.
Even a modest continuous loss matters. A measured flow of two litres a minute amounts to 1,051 kilolitres a year if it continues around the clock. A leak repair can therefore have a stronger business case than replacing fixtures across a lightly used building. Give each alert an owner, record the repair date and check whether the meter returns to its previous pattern. That last reading is the evidence that the repair worked.
Make restroom retrofits earn their place
Restrooms are a sensible starting point in malls, transport facilities, campuses and offices because use is repeated and relatively easy to observe. Inspect cistern valves and seals, check for urinals flushing throughout closed periods, test taps that run excessively long and measure the effective flush volume of existing toilets. Prioritise the busiest blocks and those scheduled for refurbishment. A fixture used hundreds of times a day offers a different return from the same model in a seldom-used meeting suite. epa.gov
Consider a building recording 1,000 flushes per operating day. If a trial reduces the measured average volume from eight litres to five, and the building operates 300 days a year, the indicative saving is 900 kilolitres a year. At an illustrative avoidable charge of R40 per kilolitre, the gross annual benefit is R36,000. These are worked assumptions. For an investment proposal, use actual flush counts, the local tariff and the portion of any sanitation charge that genuinely falls when consumption falls. Deduct additional servicing costs.
Pilot one comparable restroom block first. Record volume, footfall, repeat flushing, blockages, cleaning time and user complaints. Ask the maintenance team whether replacement parts are readily available. A unit that uses less water per flush but needs frequent repeat flushing or call-outs can lose much of its apparent advantage. The pilot gives procurement a performance specification grounded in the building’s own experience.
Look beyond the bathrooms
Where to look | Practical intervention | What to measure |
|---|---|---|
Kitchens and food courts | Repair leaking pre-rinse valves, match spray equipment to the task and run dishwashers with full racks where service permits. | Litres per meal or rack, hot-water use and cleaning performance. |
Landscaping | Repair broken heads, isolate unused zones, group plants by water need and adjust irrigation after rainfall. Review planting when landscaping contracts renew. | Irrigation volume by season, planted area and plant condition. |
Cooling towers | Meter make-up and discharge water. Ask the water-treatment specialist to review controls and operating settings against water quality and equipment requirements. | Make-up water, discharge and cooling performance under comparable conditions. |
Cleaning and wash bays | Replace routine hosing with sweeping or suitable mechanical cleaning where the task allows. Give contractors explicit methods for exceptions. | Water per cleaning cycle or vehicle, cleaning quality and labour time. |
Tanks and pumps | Inspect overflows, float valves and pump cycling. Check tanks at times when staff are unlikely to see an overflow. | Unexplained inflow, overflow events, pump hours and repair response. |
These uses are covered in the US Environmental Protection Agency’s commercial WaterSense at Work guidance. The end-use approach is transferable. Equipment settings and operating procedures should reflect local water quality, building use and municipal requirements. epa.gov
3. Match the water source to the job
Once avoidable demand has been removed, the remaining question is how much drinking-quality water the property needs. Flushing may provide a relatively steady non-potable demand. Irrigation is seasonal. A hotel may generate greywater regularly, whereas an office occupied mainly on certain weekdays may have too little recoverable water to justify a treatment system.
Potential source | Where it merits investigation | Question that can change the decision |
|---|---|---|
Harvested rainwater | Sites with usable roof area, space for storage and recurring non-potable demand. | During the months when water is needed, how much can the building actually collect, store and use? |
Municipal treated effluent | Sites within economical reach of a suitable supply, with sufficient demand for an approved use. | Will the municipality confirm availability, permitted end use, quality, connection cost and supply terms for this property? |
Treated greywater | Hotels, residences, gyms or campuses with consistent recoverable flows. | Who will operate and maintain treatment, verify quality and respond when the system is unavailable? |
Air-conditioning condensate | Buildings producing recoverable condensate close to a suitable point of use. | Does measured seasonal yield justify the pipework, storage and maintenance? |
The Johannesburg shopping centre example offers a useful starting question for any portfolio: what storage, drainage or pipe routes already exist? Reusing a suitable asset can change a project’s economics. Equally, a large tank can remain underused if demand and rainfall occur in different months. Model usable yield month by month, allow for losses and overflow, and price pumping, treatment, monitoring and maintenance. grundfos.com
Municipal engagement should happen early. Cape Town requires permission before installing or using an alternative water system, including measures to protect the drinking-water network. Elsewhere, confirm the local process and the intended use with the relevant authority. A municipality’s published reuse plans are a reason to enquire about a connection. An investment decision needs site-specific confirmation. City of Cape Town
Finally, distinguish three outcomes in the business case. A more efficient toilet reduces total water demand. Supplying the same toilet with harvested water reduces municipal drinking-water demand. A tank filled from the mains can keep facilities operating during an interruption. All three outcomes may be valuable, but they require different measures. Counting them separately also prevents the same litres being claimed twice.
4. Reduce electricity demand before sizing new supply
A building’s electricity bill tells management how much it paid. An interval load profile reveals when the demand occurred. Put a week of readings beside the actual operating timetable. Mark opening, cleaning, shift changes, deliveries and plant start-up. Then ask the facilities manager to explain the quietest hour, the highest peak and the difference between a working day and a closed day.
Air conditioning is an obvious place to investigate. Old Mutual Property’s South African shopping-centre programme, documented by the Green Building Council South Africa, focused on improving controls and operating methods for existing heating, ventilation and air-conditioning equipment. The example is relevant to owners facing replacement proposals: the operating sequence deserves examination while there is still a choice about capital expenditure. gbcsa.org.za
Four practical opportunities deserve attention.
Reset operating schedules to match occupancy. A floor that was fully occupied five days a week may now be busy on only three. A mall may run central plant for an entire wing because one tenant opens early. Check timers, zoning, holiday settings and temporary overrides. Verify comfort and ventilation during occupied periods, then check the meter after the change.
Inspect lighting by zone and task. Loading bays, car parks, offices, corridors and warehouses have different operating patterns. Combine efficient fittings with suitable zoning, daylight controls or occupancy sensing. Trial controls where staff work quietly or irregularly, and preserve emergency lighting and safe visibility.
Investigate refrigeration and hot water where they dominate the load. At food retail sites, inspect door seals, condenser cleanliness, defrost schedules and temperature alarms with the tenant or operator. In hotels, gyms and residences, measure hot-water demand and inspect distribution losses before sizing a heat pump or replacing central plant.
Read the tariff as carefully as the meter. Distinguish energy consumed in kilowatt-hours, billed demand and fixed charges. Where the tariff rewards it, staggering discretionary start-up or shifting suitable loads may reduce the bill. Record that benefit separately from any reduction in electricity consumed.
For scale, suppose an engineer establishes that 20 kW of avoidable load can be switched off for ten hours on 250 days. That equates to 50,000 kWh a year. At an illustrative avoidable energy rate of R2.50/kWh, the gross annual benefit is R125,000, before implementation costs. Demand-charge savings need separate evidence that the change reduced the peak on which the site is billed.
Solar photovoltaic generation and batteries can then be evaluated against the revised load profile. Size solar against consumption during generating hours and model export only on confirmed terms. Assess batteries against a defined purpose such as continuity for critical equipment or reduction of a billed peak. Track whole-building consumption, grid imports, on-site generation and backup fuel separately. This lets management distinguish a more efficient building from one that has changed its source of energy.
5. Reduce what enters the waste stream
A property manager can replace every bin in a building and still have little influence over the largest source of waste. In a food court it may be overproduction in tenant kitchens. In an office portfolio it may be furniture discarded during lease churn. In a distribution centre it may be stretch wrap and damaged pallets. The first task is to identify which materials arise, where they arise and who can prevent them.
Walk the route from purchase to collection. Select a representative trading week. Ask cleaning contractors and tenants to identify the main streams, weigh them where practicable, and examine contamination at the collection point. Trace the largest streams upstream. Wet cardboard may indicate poorly located storage. Large volumes of edible food at closing suggest a production or ordering issue. Half-empty skips collected on a fixed schedule point to a contract opportunity.
Give food tenants a measure they can act on. Separate preparation waste, spoilage and unsold prepared food for a short trial. A tenant can then change order quantities, batch sizes or late-day production and compare kilograms wasted per hundred meals. South Africa’s Food Loss and Waste Voluntary Agreement provides a local precedent for involving retailers and manufacturers in prevention. A landlord can make participation easier by providing weighing facilities, common definitions and feedback to individual tenants. dffe.gov.za
Prove the outlet before buying processing equipment. The City of Cape Town’s account of the N1 City shopping mall waste-to-energy pilot records that the installation was decommissioned. Its commercial viability depended on selling compost, and a market could not be established at the volumes produced. For a portfolio considering composting or digestion, the questions are concrete: who will take the output, in what quantity, at what price, and what happens if that outlet closes? A shared collection route serving several properties may warrant comparison with a separate installation at each one. resource.capetown.gov.za
Use refurbishments and lease exits to recover materials. Before a tenant strips out a floor, inventory furniture, doors, partitions, shelving and fittings. Give facilities teams at other sites an opportunity to claim suitable items before demolition begins. Specify supplier take-back or returnable packaging where a credible route exists. Record what was reused, what purchase it displaced and what disposal cost was avoided.
Report total waste generated, tonnes sent to landfill and verified recovery destinations. Diversion percentage alone can obscure deteriorating performance. A portfolio that generates 100 tonnes and diverts 60 sends 40 tonnes to landfill. If it later generates 150 tonnes and diverts 100, its diversion rate improves from 60% to 67%, yet landfill tonnage rises to 50. Both figures belong in the executive report.
6. Make the commercial arrangements support the work
In leased property, the person who can approve an intervention may be different from the person who pays the bill or operates the equipment. A landlord may own the cooling plant while tenants fund electricity through recoveries. A managing agent may see a leak immediately but lack authority to commission a repair. A cleaning contractor may be measured on presentation while the owner pays for water and waste collections. These arrangements can determine whether a technically sound project proceeds.
For each material opportunity, record who invests, who operates, who benefits and who verifies. Agree access to meter data and tenant premises where necessary. Define repair authority and escalation times. At lease renewal or contract retender, address recurring obstacles such as inaccessible submeters, unclear responsibility for leaking fixtures or collection charges that stay fixed when waste volumes fall.
The finance team should translate physical savings into cash using the charges the project can actually avoid. Annual kilolitres saved multiplied by an average bill rate can overstate value if the bill includes substantial fixed charges. Likewise, a reduction in waste weight may produce little immediate saving where the supplier charges per lift. It becomes a cash benefit when the property can remove a lift, resize a container or renegotiate the service.
Rank capital projects on more than simple payback. Include verified annual savings, service continuity, maintenance obligations, remaining asset life and the opportunity to combine work with an already funded refurbishment. Replacing sound pipework solely to supply a small restroom block with reclaimed water may be expensive. Installing a separate supply during a planned refurbishment can change the decision materially.
7. A 90-day programme for a national portfolio
Period | Action | Evidence for management |
|---|---|---|
Days 1–30 | Assemble a year of bills and available meter data. Map supply boundaries, tariffs, operating hours and contractor terms. Select pilot sites covering different building types, municipalities and service risks. | A baseline showing major users, unexplained changes, gaps in data and who owns each issue. |
Days 31–60 | Run overnight water checks, a restroom trial, an after-hours electricity review and a waste audit. Fix obvious faults. Obtain local advice on alternative water at sites where demand justifies it. | Before-and-after readings, repair records, tenant feedback and a shortlist of projects with realistic costs. |
Days 61–90 | Verify early results against comparable operating conditions. Agree funding and benefit-sharing. Group sites where a successful measure can be repeated with similar economics. | A funded programme identifying each site, accountable manager, expected benefit, verification method and review date. |
The monthly executive review can be brief. Track municipal and total water use, total electricity use and grid purchases, waste generated and landfilled, and financial savings verified against the applicable contract or tariff. Include one service measure relevant to each intervention, such as restroom complaints, occupied-hours comfort or missed collections. Flag estimated data and explain large changes in occupancy, weather or trading hours. Continue checking completed projects: a repaired valve can fail again, and a temporary plant override can quietly become permanent.
Where to begin
At the next portfolio review, ask three people to bring three pieces of evidence. Ask the facilities lead for the overnight water profile at one high-use building. Ask the energy manager for a week of electricity readings plotted against occupancy. Ask the waste contractor for the weight, destination and collection cost of the largest waste stream at one representative site. Each can lead to a specific decision, an accountable person and a result that can be verified.
That is how a national portfolio gains an advantage from its scale. One building identifies a fault. A second tests whether the remedy travels. Procurement, finance and operations then have enough evidence to decide where to repeat it. The return comes from applying a proven improvement wherever the conditions fit and keeping it working after installation.
Suraksha Maharaj, ESG Consultant at Emergent Africa, welcomes conversations with property owners, managing agents and organisations operating multiple buildings across South Africa about practical opportunities to reduce water and electricity consumption, prevent waste and build a business case for implementation.